The Wichita Airport Authority is conducting an airport master plan for the Dwight D. Eisenhower National Airport (ICT) with the clear objective to provide systematic guidelines for the airport’s overall maintenance, development, and operation. The master plan is a proactive document which identifies and plans for future facility needs well in advance of the actual need for the facilities. This is done to ensure that airport management can coordinate project approvals, design, financing, and construction to avoid experiencing detrimental effects due to inadequate facilities. The master plan examines needs over a 20-year period.
ABOUT THE MASTER PLAN
The study will be prepared by Coffman Associates, a national aviation consulting firm specializing in airport planning studies. The study process is anticipated to take approximately 18 months to complete, followed by agency reviews and approvals. The structure of the master plan follows FAA guidelines. Accordingly, the FAA will also review and accept the master plan and approve two specific elements, the aviation forecasts as well as the Airport Layout Plan (ALP), which is the set of technical drawings depicting the current and planned layout of all airport facilities.
The FAA requires certain airports, including ICT, to maintain an FAA approved ALP, which FAA uses to support grant funding for eligible capital projects. The master plan was last updated in 2005. The ALP has had minor updates since then to address specific changes at the airport. FAA recommends these be updated every five to ten years or as necessary to address changes at the airport and/or in the aviation industry. The airport has experienced significant increases in passenger levels in recent years, and completed a new terminal building, therefore, the timing is right to evaluate the future of the airport.
ABOUT DWIGHT D. EISENHOWER
NATIONAL AIRPORT
The Wichita Airport Authority is conducting an airport master plan for the Dwight D. Eisenhower National Airport (ICT) with the clear objective to provide systematic guidelines for the airport’s overall maintenance, development, and operation. The master plan is a proactive document which identifies and plans for future facility needs well in advance of the actual need for the facilities. This is done to ensure that airport management can coordinate project approvals, design, financing, and construction to avoid experiencing detrimental effects due to inadequate facilities. The master plan examines needs over a 20-year period.
SCHEDULE
SCHEDULE
MASTER PLAN DOCUMENTS
Draft chapters will be posted as the study progresses. Files will be in PDF format and available for download and print.
Documents Available for Download
PUBLIC INVOLVEMENT
The approach to involving the community is multi-faceted. The Planning Advisory Committee (PAC) is a group of airport stakeholders who have been asked to volunteer their time to aid in the development of the master plan. The PAC will be convened for four meetings to review draft chapters as developed by the consultant team. The same draft chapters made available to the PAC will be posted to this project website.
There will be three public information workshops during the study process. The workshops will be conducted in an open-house format where the public can visit with the project team and ask any questions they may have related to the project. The workshops are typically scheduled in the early evening to allow those heading home from work to stop by or to allow others to come after the dinner hour. The date and time of the workshops will be advertised locally and posted on this project website.
Draft chapters of the master plan report will be posted to this dedicated project website so that anyone can learn about the study process and review and comment on the draft material during the study. All community members are encouraged to engage in the process and provide comments to the project team. Interested parties can also utilize the ‘Comment’ feature on this project website. Direct communication with the project managers via phone or email is also acceptable. The project managers for the master plan project are listed in the bottom of this website.
FREQUENTLY ASKED QUESTIONS